Tricel Novo 8 sewage treatment plant installation in Sway, Lymington

Posted by: Greg Mouland

Tricel Novo 8 sewage treatment plant installation in Sway, Lymington

An initial pre-purchase survey revealed a critical issue: the existing septic tank was non-compliant and discharging directly into a local watercourse.

Careful planning, necessitated by the high winter water table in the area, led to the installation of a new Tricel Novo 8 domestic sewage treatment plant.

This advanced system has now rendered the property fully compliant and legal.
The Tricel Novo stands as a highly reliable, submerged aeration sewage treatment plant, meticulously engineered for both domestic and commercial applications.

It is particularly renowned for its exceptionally durable, compression-molded SMC tank, boasting an impressive lifespan of 20 to 40 years, and its significant capacity to drastically minimize both installation efforts and long-term operational costs.

Discover the Distinct Advantages of the Tricel Novo:
Highly Durable SMC Tank:Crafted under intense heat and pressure from Sheet Moulding Compound (SMC), this tank offers unparalleled strength and exceptional longevity, far surpassing that of standard GRP or polyethylene alternatives.

No Internal Moving Parts or Pumps:A key differentiator, the Novo uniquely incorporates no mechanical parts or pumps submerged within its main tank. This design ingeniously minimizes the potential for internal breakdowns, thereby substantially reducing ongoing repair and maintenance expenditures.

Cost-Effective Installation:Thanks to its robust construction, most installation sites eliminate the need for concrete backfill, leading to a substantial reduction in overall installation costs.

Long-Lasting Ceramic Diffuser:The advanced aeration system is equipped with a specialized ceramic diffuser, engineered to deliver approximately twice the operational lifespan of conventional rubber equivalents. This innovation significantly curtails both replacement costs and maintenance call-outs.

Full Regulatory Compliance:This plant rigorously adheres to the stringent regulatory requirements outlined by the Environment Agency’s General Binding Rules and holds full certification under the European Standard EN12566-3.

Low Running Costs:Integrating highly energy-efficient components, the system is designed to keep monthly electrical and operational costs exceptionally low.

Shallow Invert Design:Its innovative shallow dig profile minimizes the volume of excavation required, translating into significant savings in both time and financial outlay during the installation process.

Built-in Alarm:All systems come standard with an integrated loss-of-pressure alarm, designed to immediately alert users to any potential operating issues.

Call now for your free quotation! ☎️

Tricel Novo 8 sewage treatment plant installation in Sway, Lymington

Proudly a Checkatrade approved company ✅
Based locally in The New Forest
☎️ 01590 435100
www.moulanddrainage.co.uk